大体积混凝土冬期施工
引用本文:成荣先.大体积混凝土冬期施工[J].宁夏工程技术,2002,1(4):386-388.
作者姓名:成荣先
作者单位:宁夏建设集团有限责任公司,宁夏,银川,750021
摘    要:在大体积混凝土与冬期施工条件同时具备的情况下,如何保证混凝土施工质量?文章通过一项工程实例介绍了大体积混凝土冬期施工在配合比设计,混凝土浇筑顺序,混凝土内外温控监测及混凝土保温养护等方面采取的有效控制手段,保证了混凝土工程质量.

关 键 词:大体积混凝土  冬期施工  裂缝控制  温度控制  施工工艺
文章编号:1671-7244(2002)04-386-03
修稿时间:2002年10月22

Mass concrete construction in winter phase
CHENG Rong-xian.Mass concrete construction in winter phase[J].Ningxia Engineering Technology,2002,1(4):386-388.
Authors:CHENG Rong-xian
Abstract:Under the circumstances when mass concrete construction happens in winter phase, how to pledge the concrete construction quality? Monitoring the temperature control inside and outside one engineering project, this text has introduced the cardinal principle that mass concrete winter phase construction is more sequential in the design of concrete pouring building and concrete heat preservation, etc. The paper also adopts effective control means to pledge the concrete engineering quality.
Keywords:mass concrete  winter phase construction  crack control  temperature control  construction method  