高速铁路24 m箱梁预制施工技术.
引用本文:梁伟.高速铁路24 m箱梁预制施工技术.[J].山西建筑,2003,29(6):240-241.
作者姓名:梁伟
作者单位:中铁十二局集团工程管理部,山西,太原,030024
摘    要:以秦沈铁路客运专线兴城西河特大桥 2 4m单线箱梁预制施工工程为例 ,阐述了 2 4m单线箱梁的施工模具设计等一整套施工工艺 ,指出箱梁施工技术是今后施工设计研究的方向。

关 键 词:高速铁路  箱梁  预制  施工技术
文章编号:1009-6825(2003)06-0240-02
修稿时间:2003年3月14日

Prefabricated construction technique of 24 m box beam in high-speed railway
LIANG Wei.Prefabricated construction technique of 24 m box beam in high-speed railway[J].Shanxi Architecture,2003,29(6):240-241.
Authors:LIANG Wei
Abstract:Taking the prefabricated construction works of 24m box beam of Xihe Bridge in Qinhuagdao Shenyang special railway line for passenger transportation The construction mould design and other series construction technologies are elaborated for 24m single line box beam. Meanwhile, author points out that the box beam construction technology is research direction in the future.
Keywords:high  speed railway  box beam  prefabricated  construction technique  