秦山300MW核电机组全范围仿真机测试验收
引用本文:房晓东.秦山300MW核电机组全范围仿真机测试验收[J].核动力工程,1996,17(3):218-223.
作者姓名:房晓东
作者单位:亚洲仿真控制系统工程有限公司!广东珠海,519015
摘    要:介绍了秦山300MW核电机组全范围仿真机的测试验收的整个过程,包括:验收测试规程的形成,工厂内部预测试和工厂用户测试。并分析了测试验收过程中存在的重大问题及解决的办法。

关 键 词:核电厂  秦山  核发电机组  仿真机  测试验收

Acceptance Test of Full Scope Simulator for Qinshan 300MW Nuclear Power Unit
Fang Xiaodong.Acceptance Test of Full Scope Simulator for Qinshan 300MW Nuclear Power Unit[J].Nuclear Power Engineering,1996,17(3):218-223.
Authors:Fang Xiaodong
Abstract:The paper introduces the whole acceptance test procedure of Qinshan 300MW Nuclear Power Unit Full Scope Simulator.The following stages are included:formation of Accep tance Test Procedure documents;preacceptance test of the simulator in factory;Accep tance Test of the simulator in factory,The main problems in acceptance test procedure and measures for solving them are analysed.
Keywords:Qinshan Nuclear Power Plant Full scope simulator Acceptance test  