首页 | 官方网站   微博 | 高级检索  
     

平班水电站左岸重力坝常态混凝土配合比优化设计
引用本文:袁瑶才.平班水电站左岸重力坝常态混凝土配合比优化设计[J].广西水利水电,2006(3):7-9,22.
作者姓名:袁瑶才
作者单位:广西水电工程局,南宁,530001
摘    要:根据平班水电站所采用原材料的特性,经过混凝土配合比优化设计试验,应用混凝土"双掺"技术及粉煤灰"超代"技术,揭示了各原材料相互间的组合及变化规律,改善和提高混凝土的技术性能,达到保证满足工程技术要求以及经济、节约目的.

关 键 词:混凝土  配合比  优化  平班水电站
文章编号:1003-1510(2006)03-0007-03
收稿时间:2006-06-06
修稿时间:2006-06-06

Optimization of normal concrete mix proportion for left-bank gravity dam of Pingban Hydropower Plant
YUAN Yao-cai.Optimization of normal concrete mix proportion for left-bank gravity dam of Pingban Hydropower Plant[J].Gx Water Resources & Hydropower Engineering,2006(3):7-9,22.
Authors:YUAN Yao-cai
Affiliation:Guangxi Water and Power Construction Bureau, Nanning 530001, China
Abstract:According to the characteristics of raw materials used by Pingban Hydropower Plant, based on concrete mix proportion optimization design and test, concrete double-mixing technique and fly ash extra-substitute technique are applied to reveal the combination of raw materials and change rule, improve the technical property of concrete, satisfy the engineering technical requirements with less cost.
Keywords:Concrete  mix proportion  optimization  Pingban Hydropower Plant
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号