深厚含水基岩区立井外壁冻结压力的实测与分析
引用本文:张驰,杨维好,杨志江,李海鹏.深厚含水基岩区立井外壁冻结压力的实测与分析[J].煤炭学报,2012,37(1):33-38.
作者姓名:张驰  杨维好  杨志江  李海鹏
作者单位:中国矿业大学 深部岩土力学与地下工程国家重点实验室,江苏 徐州 221116
基金项目:国家自然科学基金青年科学基金资助项目(40801032);国家自然科学基金资助项目(41171065)
摘    要:为明确我国西部深厚含水基岩区立井外壁的载荷,在鄂尔多斯市呼吉尔特矿区开展了基岩冻结压力的现场实测研究。结果表明:凿井期基岩冻结压力的变化规律可分为急剧增长、缓慢增长、快速增长、逐步减小4个阶段;基岩冻结压力主要受原岩富水条件、强度等因素的影响,与岩层埋深H关系不大;基岩冻结压力在混凝土浇注后的10~15 d即达到冻结压力最大值P max的76.4%~89.8%,建议采用7 d混凝土强度指标来保证外壁早期质量;基岩冻结压力在混凝土浇注后的80~100 d增长至最大值P max,P max实测值仅为1.08~1.74 MPa,远小于按岩层埋深H换算的静水压力值P 0,更远小于特厚冲积表土中的冻结压力上限值P ω。

关 键 词:深厚含水基岩  冻结凿井法  冻结压力  外层井壁  
收稿时间:2011-09-30

In-situ measurement and analysis of freezing pressure of outer shaft lining in deep aqueous bed rock
ZHANG Chi,YANG Wei-hao,YANG Zhi-jiang,LI Hai-peng.In-situ measurement and analysis of freezing pressure of outer shaft lining in deep aqueous bed rock[J].Journal of China Coal Society,2012,37(1):33-38.
Authors:ZHANG Chi  YANG Wei-hao  YANG Zhi-jiang  LI Hai-peng
Affiliation:1,2(1.State Key Laboratory for Geomechanics & Deep Underground Engineering,China University of Mining & Technology,Xuzhou 221116,China;2.School of Mechanics & Civil Engineering,China University of Mining & Technology,Xuzhou 221116,China)
Abstract:In order to thoroughly investigate the load of outer shaft lining in deep aqueous bed rock area,in-situ measurements on freezing pressure of outer shaft lining were carried out in bed rock in Hujierte coalfield in Chinese Erdos.The in-situ measurement results reveal that the process of freezing pressure can be described by 4 periods:dramatic increase period,slow increase period,rapid increase period and gradual decrease period.The freezing pressure is mainly affected by rock moisture content and rock strength,but the rocks buried deep H affects little.The freezing pressure reaches 76.4%~89.8% of the maximum freezing pressure Pmax at 10~15 days after concrete pouring.Therefore,it is recommended using 7 days concrete strength index to guarantee the safety of outer shaft lining during the early period.The freezing pressure reaches the maximum value Pmax at 80~100 days after concrete pouring,the measured value of Pmax is 1.08~1.74 MPa.Pmax is much smaller than hydrostatic pressure P0 and the maximum freezing pressure Pω in deep alluvium.
Keywords:deep aqueous bed rock  freeze sinking method  freezing pressure  outer shaft lining