摘    要:锦屏二级水电站地下厂房岩锚梁地质条件较差,岩锚梁开挖过程中采取了沿保护层深孔预裂、分区开挖,在斜台下部增加锁口锚杆、用高强树脂锚杆超前支护、超前灌浆等多项有效技术措施,岩壁梁施工取得了良好的效果。

关 键 词:锦屏二级水电站  地下厂房  岩锚梁  施工

Construction of rock anchored beam of underground powerhouse for Jinping-Ⅱ Hydropower Station
ZHANG Jian-jun.Construction of rock anchored beam of underground powerhouse for Jinping-Ⅱ Hydropower Station[J].Water Resources and Hydropower Engineering,2008,39(11).
Authors:ZHANG Jian-jun
Abstract:As the geological condition for the rock anchored beam of the underground powerhouse of Jinping-II Hydropower Station is poor,the effective construction measures such as deep hole pre-splitting and zoning excavation along the protected layer,adding locked anchor-bars at the lower part of the declined table,advanced supporting with high-strength resin anchor-bars,advanced grouting etc.are adopted therein,and then better construction effect is obtained as well.
Keywords:Jinping-II Hydropower Station  underground powerhouse  rock anchored beam  construction