首页 | 官方网站   微博 | 高级检索  
     

两库联合排沙
引用本文:邓良魁,邓琪,郭巨才,白明娣.两库联合排沙[J].水利学报,2000,31(5):37-41.
作者姓名:邓良魁  邓琪  郭巨才  白明娣
作者单位:水利部山西水利水电勘测设计研究院,山西 太原
摘    要:在多沙河流的邻近河段上同时修建上、下两座水库,联合调节河流水沙.上库汛后拦蓄河流来水,至汛期泄空水库利用洪水冲淤,将蓄水期间淤积的泥沙排出水库;下库汛期调蓄来水,待蓄水用完,由上库供水进行冲刷排淤,再将淤在下库的泥沙排出水库,解决多沙河流单一水库排沙与蓄水调节径流的矛盾.两库淤沙与冲淤排沙达到平衡以后,虽然部分库容被淤,但是保留下来的有效库容能够长期调水调沙.

关 键 词:多沙河流  水库淤沙  两库联合  排沙理想
文章编号:0559-9350(2000)05-0037-05
修稿时间:1999年4月5日

Sediment sluicing by joint operation of two reservoirs in cascade
DENG Liangkui,Deng Qi,GUO Jucai,BAI Mingdi.Sediment sluicing by joint operation of two reservoirs in cascade[J].Journal of Hydraulic Engineering,2000,31(5):37-41.
Authors:DENG Liangkui  Deng Qi  GUO Jucai  BAI Mingdi
Abstract:This paper presents a scenario in which two reservoirs in cascade are jointly used to regulate water and silt. The upstream reservoir retains water during post flood period and discharges water in flood season. Thus, it makes use of flood to sluice sediment during flood period. At the same time the downstream reservoir regulates the incoming water during flood period. After the retained water is used up, the downstream reservoir uses water from upstream reservoir to sluice sediment. This mode of operation can coordinate sediment sluicing and water retaining. After the balance of sediment depositing and sluicing is achieved, the effective reservoir volumes can regulate both water and silt for a long term.
Keywords:silt river  reservoir sediment  joint operation  cascade  premium silt discharging  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《水利学报》浏览原始摘要信息
点击此处可从《水利学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号