首页 | 官方网站   微博 | 高级检索  
     

大花水水电站碾压混凝土拱坝快速施工技术
引用本文:田福文.大花水水电站碾压混凝土拱坝快速施工技术[J].湖北水力发电,2008(6).
作者姓名:田福文
作者单位:中国水利水电第八工程局有限公司
摘    要:大花水水电站拦河大坝为碾压混凝土双曲拱坝,最大坝高134.50 m。采用快速施工技术,创造了国内碾压混凝土连续浇筑上升33.5 m的记录。重点介绍了高速胶带机水平运输技术、缓降溜管垂直运输技术以及碾压混凝土仓面工艺。

关 键 词:碾压混凝土  快速施工  高速胶带机  负压溜槽  缓降器

Quick construction technique for roller compacted concrete arch dam of Dahuashui Hydropower Station
TIAN Fuwen.Quick construction technique for roller compacted concrete arch dam of Dahuashui Hydropower Station[J].Hubei Water Power,2008(6).
Authors:TIAN Fuwen
Affiliation:Sinohydro Engineering Bureau 8;Changsha 410007;China
Abstract:The concrete placing pace of the 134.5 m high roller compacted concrete(RCC) arch dam of Dahuashui Hydropower Station is quickened by using the belt conveyor system with gently lowering pipe chutes;a new construction record of continuously concreting height 33.5 m is achieved.The details about concrete conveying and spreading are described.
Keywords:roller compacted concrete(RCC)  quick construction  high speed belt conveyor  negative chute  gently lowering pipe chute