首页 | 官方网站   微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   194篇
  免费   14篇
工业技术   208篇
  2023年   1篇
  2022年   5篇
  2021年   7篇
  2020年   4篇
  2019年   11篇
  2018年   6篇
  2017年   11篇
  2016年   8篇
  2015年   6篇
  2014年   10篇
  2013年   23篇
  2012年   8篇
  2011年   24篇
  2010年   17篇
  2009年   11篇
  2008年   11篇
  2007年   10篇
  2006年   4篇
  2005年   7篇
  2004年   3篇
  2003年   4篇
  2002年   1篇
  2001年   4篇
  2000年   3篇
  1999年   1篇
  1998年   2篇
  1993年   1篇
  1992年   2篇
  1990年   1篇
  1984年   2篇
排序方式: 共有208条查询结果,搜索用时 203 毫秒
1.
2.
Remanufacturing facilities usually face a trade-off between limited information about remanufacturing yields and potentially long supplier lead times. To improve production performance, these firms may attempt to acquire more timely and accurate information about remanufacturing yields or alternatively, to reduce the lead times of purchased parts. We develop four decision-making models to evaluate the impact of yield information and supplier lead time on manufacturing costs. We identify the operating conditions under which these capabilities are valuable, along with their relative impact on facility performance. Each model is formulated as an infinite horizon, stochastic dynamic program (Markov decision process). Our results indicate that the yield information is generally quite valuable, while investments in supplier responsiveness provide trivial returns to products with few parts. However, as product complexity increases with large number of target parts, the value of short lead times increases.  相似文献   
3.
4.
The metastable phase diagram of the BCC-based ordering equilibria in the Fe–Al–Mo system has been calculated via a truncated cluster expansion, through the combination of Full-Potential-Linear augmented Plane Wave (FP-LAPW) electronic structure calculations and of Cluster Variation Method (CVM) thermodynamic calculations in the irregular tetrahedron approximation. Four isothermal sections at 1750 K, 2000 K, 2250 K and 2500 K are calculated and correlated with recently published experimental data on the system. The results confirm that the critical temperature for the order–disorder equilibrium between Fe3Al–D03 and FeAl–B2 is increased by Mo additions, while the critical temperature for the FeAl–B2/A2 equilibrium is kept approximately invariant with increasing Mo contents. The stabilization of the Al-rich A2 phase in equilibrium with overstoichiometric B2–(Fe,Mo)Al is also consistent with the attribution of the A2 structure to the τ2 phase, stable at high temperatures in overstoichiometric B2–FeAl.  相似文献   
5.
Inspection for corrosion of gas storage spheres at the welding seam lines must be done periodically. Until now this inspection is being done manually and has a high cost associated to it and a high risk of inspection personel injuries. The Brazilian Petroleum Company, Petrobras, is seeking cost reduction and personel safety by the use of autonomous robot technology. This paper presents the development of a robot capable of autonomously follow a welding line and transporting corrosion measurement sensors. The robot uses a pair of sensors each composed of a laser source and a video camera that allows the estimation of the center of the welding line. The mechanical robot uses four magnetic wheels to adhere to the sphere’s surface and was constructed in a way that always three wheels are in contact with the sphere’s metallic surface which guarantees enough magnetic atraction to hold the robot in the sphere’s surface all the time. Additionally, an independently actuated table for attaching the corrosion inspection sensors was included for small position corrections. Tests were conducted at the laboratory and in a real sphere showing the validity of the proposed approach and implementation.  相似文献   
6.
This work presents a genetic operator developed from mathematical methods of curve extrapolation applied in solving problems in geoelectrical prospection. This operator will assist the production of fitter individuals in the population of a genetic algorithm in which inherent patterns of the best individuals of each generation are recognized. The proposed operator in conjunction with a real‐coded genetic algorithm is compared to five alternative optimization techniques known and used in the application to problems in geoelectrical prospection. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   
7.
Platelets are cytoplasmatic fragments from bone marrow megakaryocytes present in blood. In this work, we review the basis of platelet mechanisms, their participation in syndromes and in arterial thrombosis, and their potential as a target for designing new antithrombotic agents. The option of new biotechnological sources is also explored.  相似文献   
8.
The main task in this paper is to present a performance analysis of a distribution network in the presence of an independent power producer (IP) synchronous generator with its speed governor and voltage regulator modeled using TACSTransient Analysis of Control Systems, for distributed generation studies. Regulators were implemented through their transfer functions in the S domain. However, since ATP-EMTP (Electromagnetic Transient Program) works in the time domain, a discretization is necessary to return the TACS output to time domain. It must be highlighted that this generator is driven by a steam turbine, and the whole system with regulators and the equivalent of the power authority system at the common coupling point (CCP) are modeled in the “ATP-EMTPAlternative Transients Program”.  相似文献   
9.
This article presents the main regulatory changes that occurred in the Brazilian power sector in 2009, along with the impacts these changes caused on the market, especially related to small hydropower (<30 MW). This study addresses regulatory issues based on inventory studies and records of basic projects, changes related to the compensation of the assured energy of SHPs in the Brazilian energy reallocation market, the socio-economic impact resulting from the construction of SHPs, SHPs in alternative resource auctions and finally the general outlook for the growth scenario for SHPs in Brazil according to the ten-year plan (2010–2019). The overall conclusions of this investigation were that the 2008/2009 biennium was a period of great changes in the regulation of small hydropower plants in Brazil, and the SHP market has shown maturity. Additionally, despite SHP being a type of technology that is completely dominated by domestic industry, in recent years, they have experienced policy disincentives caused by changes to rules that inhibit their growth.  相似文献   
10.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号