全文获取类型
收费全文 | 221篇 |
免费 | 15篇 |
国内免费 | 2篇 |
学科分类
环境安全 | 238篇 |
出版年
2024年 | 3篇 |
2023年 | 6篇 |
2021年 | 5篇 |
2020年 | 10篇 |
2019年 | 11篇 |
2018年 | 8篇 |
2017年 | 13篇 |
2016年 | 8篇 |
2015年 | 18篇 |
2014年 | 17篇 |
2013年 | 16篇 |
2012年 | 12篇 |
2011年 | 16篇 |
2010年 | 14篇 |
2009年 | 14篇 |
2008年 | 8篇 |
2007年 | 12篇 |
2006年 | 9篇 |
2005年 | 4篇 |
2004年 | 5篇 |
2003年 | 10篇 |
2002年 | 1篇 |
2001年 | 3篇 |
2000年 | 2篇 |
1999年 | 5篇 |
1998年 | 4篇 |
1997年 | 2篇 |
1992年 | 1篇 |
1991年 | 1篇 |
排序方式: 共有238条查询结果,搜索用时 22 毫秒
31.
Ahmad R. Shouman 《Journal of Loss Prevention in the Process Industries》1998,11(6):383-390
A very simple solution to the thermal explosion problem for one-dimensional solids is presented. The solution produces analytical expressions for the criticality condition. Two different solutions are used. One solution gives higher answers than those known from exact solutions and the second solution gives lower answers. This allows bracketing the expected answer with a determined tolerance. The results obtained compare quite favorably with those obtained from known exact numerical solutions. This allows the utilization of the present method for many a practical problem with an acceptable tolerances. 相似文献
32.
开车前安全审核(PSSR)的理解及运用 总被引:1,自引:1,他引:1
PSSR是基于对安全要求不断提高,对过程安全控制不断完善的目标下发展和建立起来的,其目的在于判定新改扩建项目及停运再投运的设备能否安全启动,是国外大多数高危行业过程管理中的一个必须的要素。本文通过对独石化公司1000万吨/年炼油及120万吨/年乙烯改扩建工程项目成功实施开车前安全审核(PSSR)进行总结,阐明了与以往开工前竣工验收的区别,运用中应注意的问题,以及成功实施PSSR的因素。为今后的其它新改扩建项目的顺利开工提供参考。 相似文献
33.
Eva Krick 《Journal of Environmental Policy & Planning》2018,20(1):64-80
This study deals with the German Federal Government’s approach of ensuring public support for its ‘Energiewende’, the swift and complete transition to an energy system based on renewable sources. First, the government’s ‘consensus management’ strategy is described as consisting of four elements: the setup of stakeholder deliberation fora; the funding of organisations dedicated to the public promotion of the energy transition; public campaigns that appeal to people’s commitment and the support of research on energy technologies. The study then traces the need for a strong social mandate of the energy transition back to the scope of the regulatory challenge and the recently growing conflicts around implementation, to institutional constraints of a consensus democracy and to the narrative of ‘Energiewende’ as the ‘grand national task’. 相似文献
34.
Patrick Devine-Wright 《Journal of environmental psychology》2011,31(4):336-343
Efforts by many governments to mitigate climate change by increasing deployment of renewable energy technologies have raised the importance of issues of public acceptance. The ‘NIMBY’ (Not In My Backyard) concept, although popular, has been critiqued as an appropriate and valid way to explain local opposition. This study applies an alternative approach, empirically investigating the role of place attachment and place-related symbolic meanings in explaining public responses to a tidal energy converter in Northern Ireland, said to be the first grid-connected device of its kind in the world. 271 residents in two nearby villages completed questionnaire surveys, three months post-installation, following up preliminary qualitative research using focus groups. Although results indicated predominantly positive and supportive responses to the project, manifest by emotional responses and levels of acceptance, significant differences between residents in each village were also observed. Contrasting patterns of association between place attachment and emotional responses suggest that the project enhanced rather than disrupted place attachments only in one of the two villages. In regression analyses, place attachment emerged as a significant, positive predictor of project acceptance in both places, affirming its value in explaining public response. Place-related symbolic meanings also emerged as significant, with contrasting sets of meanings proving significant in each context. Implications of the findings for research on place attachment and responses to land-use changes, as well as for developers seeking to engage with residents affected by energy projects are discussed. 相似文献
35.
Alexander Wezel Maria Zipfer Christine Aubry Fabienne Barataud Alois Heißenhuber 《Journal of Environmental Planning and Management》2016,59(2):183-202
Management of water quality in drinking water catchments is of ongoing, high importance as nitrate concentrations are often still very high. We analysed the Augsburg catchment in Germany, a unique example where a result-oriented approach has been implemented. We investigated the historical evolution of the water protection programme, the result-oriented payment contracts with farmers, and farmer satisfaction with the contracts, based on interviews with the water utility and farmers as well as an analysis of the literature. Today, the water protection programme has been successfully implemented, and a significant reduction of nitrate concentration was achieved due to the following factors: (1) investment of non-negligible amounts of money for high compensation and remuneration payments, (2) different contract options, (3) farmers’ participation in the negotiation process for result-oriented payment contracts, (4) involvement of “outside” people and institutions in negotiation processes, (5) anticipation of starting a programme when nitrate levels were still far below legislative thresholds, and (6) a political and legislative framework allowing direct decisions by a water supplier. 相似文献
36.
Susana Batel Patrick Devine-Wright 《Journal of Environmental Planning and Management》2015,58(6):1076-1095
A national-local ‘gap’ is often used as the starting point for analyses of public responses to large scale energy infrastructures. We critique three assumptions found in that literature: the public's positive attitudes, without further examining other type of perceptions at a national level; that local perceptions are best examined through a siting rather than place-based approach; that a gap exists between national and local responses, despite a non-correspondence in how these are examined. Survey research conducted at national and local levels about electricity transmission lines in the UK confirm these criticisms. Results do not support a gap between national and local levels; instead, both differences and similarities were found. Results show the value of adopting a place-based approach and the role of surveys to inform policy making are discussed. 相似文献
37.
Polypropylene (PP) meltblown fibers were coated with titanium dioxide (TiO2) nanoparticles using layer-by-layer (LbL) deposition technique. The fibers were first modified with 3 layers of poly(4-styrenesulfonic acid) (PSS) and poly(diallyl-dimethylammonium chloride) (PDADMAC) to improve the anchoring of the TiO2 nanoparticle clusters. PDADMAC, which is positively charged, was then used as counter polyelectrolyte in tandem with anionic TiO2 nanoparticles to construct TiO2/PDADMAC bilayer in the LbL fashion. The number of deposited TiO2/PDADMAC layers was varied from 1 to 7 bilayer, and could be used to adjust TiO2 loading. The LbL technique showed higher TiO2 loading efficiency than the impregnation approach. The modified fibers were tested for their photocatalytic activity against a model dye, Methylene Blue (MB). Results showed that the TiO2 modified fibers exhibited excellent photocatalytic activity efficiency similar to that of TiO2 powder dispersed in solution. The deposition of TiO2 3 bilayer on the PP substrate was sufficient to produce nanocomposite fibers that could bleach the MB solution in less than 4 hr. TiO2-LbL constructions also preserved TiO2 adhesion on substrate surface after 1 cycle of photocatalytic test. Successive photocatalytic test showed decline in MB reduction rate with loss of TiO2 particles from the substrate outer surface. However, even in the third cycle, the TiO2 modified fibers are still moderately effective as it could remove more than 95% of MB after 8 hr of treatment. 相似文献
38.
质量控制是贯穿环境监测全过程的技术手段和管理程序,文章通过对建设项竣工验收监测质量控制进行阐述,其目的是为了提高我们的监测水平和能力,更好的保护好我们的生态环境。 相似文献
39.
基于水泥工业的生产工艺特点,说明新型干法生产时代,水泥生产的主要产污环节及特征污染物,并分析其对生态环境的影响和危害,表明该行业属高能耗、高污染的产能过剩行业.根据建设项目竣工环境保护验收规范要求和工作实践经验,结合生产工艺、特征污染物和污染物总量控制等要求,从废水监测、废气监测、噪声监测等方面阐明水泥行业项目竣工环保验收的侧重点和注意事项,并指出污染防治设施、总量控制等几方面应重点关注的问题. 相似文献
40.