首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到10条相似文献,搜索用时 203 毫秒
1.
In this paper, a bi-objective multi-product (r,Q) inventory model in which the inventory level is reviewed continuously is proposed. The aim of this work is to find the optimal value for both order quantity and reorder point through minimizing the total cost and maximizing the service level of the proposed model simultaneously. It is assumed that shortage could occur and unsatisfied demand could be backordered, too. There is a budget limitation and storage space constraint in the model. With regard to complexity of the proposed model, several Pareto-based meta-heuristic approaches such as multi-objective vibration damping optimization (MOVDO), multi-objective imperialist competitive algorithm (MOICA), multi-objective particle swarm optimization (MOPSO), non-dominated ranked genetic algorithm (NRGA), and non-dominated sorting genetic algorithm (NSGA-II) are applied to solve the model. In order to compare the results, several numerical examples are generated and then the algorithms were analyzed statistically and graphically.  相似文献   

2.
Contractor selection is a matter of particular attraction for project managers whose aim is to complete projects considering time, cost and quality issues. Traditionally, project scheduling and contractor selection decisions are made separately and sequentially. However, it is usually necessary to satisfy some principles and obligations that impose hard constraints to the problem under consideration. Ignoring this important issue and making project scheduling and contractor selection decisions consecutively may be suboptimal to a holistic view that makes all interrelated decisions in an integrated manner. In this paper, an integrated bi-objective optimization model is proposed to deal with Multi-mode Resource Constrained Project Scheduling Problem (MRCPSP) and Contractor Selection (CS) problem, simultaneously. The objective of the proposed model is to minimize the total costs of the project, and minimize the makespan of the project, simultaneously. To solve the integrated MRCPSP-CS, two multi-objective meta-heuristic algorithms, Non-Dominated Sorting Genetic Algorithm (NSGA-II) and Multi-Objective Particle Swarm Optimization algorithm (MOPSO), are adopted, and 30 test problems of different sizes are solved. The parameter tuning is performed using the Taguchi method. Then, diversification metric (DM), mean ideal distance (MID), quality metric (QM) and number of Pareto solutions (NPS) are used to quantify the performance of meta-heuristic algorithms. Analytic Hierarchy Process (AHP), as a prominent multi-attribute decision-making method, is used to determine the relative importance of performance metrics. Computational results show the superior performance of MOPSO compared to NSGA-II for small-, medium- and large-sized test problems. Moreover, a sensitivity analysis shows that by increasing the number of available contractors, not only the makespan of the project is shortened, but also, the value of NPS in the Pareto front increases, which means that the decision maker(s) can make a wider variety of decisions in a more flexible manner.  相似文献   

3.
Nowadays in competitive markets, production organizations are looking to increase their efficiency and optimize manufacturing operations. In addition, batch processor machines (BPMs) are faster and cheaper to carry out operations; thus the performance of manufacturing systems is increased. This paper studies a production scheduling problem on unrelated parallel BPMs with considering the release time and ready time for jobs as well as batch capacity constraints. In unrelated parallel BPMs, modern machines are used in a production line side by side with older machines that have different purchasing costs; so this factor is introduced as a novel objective to calculate the optimum cost for purchasing various machines due to the budget. Thus, a new bi-objective mathematical model is presented to minimize the makespan (i.e., Cmax), tardiness/earliness penalties and the purchasing cost of machines simultaneously. The presented model is first coded and solved by the ε-constraint‌ method. Because of the complexity of the NP-hard problem, exact methods are not able to optimally solve large-sized problems in a reasonable time. Therefore, we propose a multi-objective harmony search (MOHS) algorithm. the results are compared with the multi-objective particle swarm optimization (MOPSO), non-dominated sorting genetic algorithm (NSGA-II), and multi-objective ant colony optimization algorithm (MOACO). To tune their parameters, the Taguchi method is used. The results are compared by five metrics that show the effectiveness of the proposed MOHS algorithm compared with the MOPSO, NSGA-II and MOACO. At last, the sensitivity of the model is analyzed on new parameters and impacts of each parameter are illustrated on bi- objective functions.  相似文献   

4.
This study presents a new bi-objective mathematical model for an imperfect production system (IPS) that accounts for product returns and quality levels under two different warranty policies. We considered uncertain customer demand as stochastic behavior and product price as a function of return compensation, product quality level, and warranty-period length. We simultaneously looked at the pro rata warranty and free replacement/repair warranty policies and assumed that customers can choose the desired policy. A return policy for an online distributor was also included and two objective functions were used to address the problem. The first objective function maximized the total expected revenue, and the second objective function maximized customer satisfaction. The non-dominated sorting genetic algorithm (NSGA-II) and two others, the basic bee metaheuristic and teaching-learning-based optimization algorithms, were used to generate the initial solution for use in the NSGA-II algorithm. The results from the hybrid algorithms revealed that the proposed method improves the performance of the NSGA-II algorithm. Finally, several specific sensitivity analyses were conducted to determine the effects of the problem parameters.  相似文献   

5.
In this study, an integrated multi-objective production-distribution flow-shop scheduling problem will be taken into consideration with respect to two objective functions. The first objective function aims to minimize total weighted tardiness and make-span and the second objective function aims to minimize the summation of total weighted earliness, total weighted number of tardy jobs, inventory costs and total delivery costs. Firstly, a mathematical model is proposed for this problem. After that, two new meta-heuristic algorithms are developed in order to solve the problem. The first algorithm (HCMOPSO), is a multi-objective particle swarm optimization combined with a heuristic mutation operator, Gaussian membership function and a chaotic sequence and the second algorithm (HBNSGA-II), is a non-dominated sorting genetic algorithm II with a heuristic criterion for generation of initial population and a heuristic crossover operator. The proposed HCMOPSO and HBNSGA-II are tested and compared with a Non-dominated Sorting Genetic Algorithm II (NSGA-II), a Multi-Objective Particle Swarm Optimization (MOPSO) and two state-of-the-art algorithms from recent researches, by means of several comparing criteria. The computational experiments demonstrate the outperformance of the proposed HCMOPSO and HBNSGA-II.  相似文献   

6.
The time-cost trade-off problem is a known bi-objective problem in the field of project management. Recently, a new parameter, the quality of the project has been added to previously considered time and cost parameters. The main specification of the time-cost trade-off problem is discretization of the decision space to limited and accountable decision variables. In this situation the efficiency of the traditional methods decrease and applying of the evolutionary algorithms is necessary. In this paper, two evolutionary algorithms that originally search the decision space in a continuous manner including: (1) multi-objective particle swarm optimization (MOPSO) and (2) nondominated sorting genetic algorithm (NSGA)-II, are considered as the optimization tools to solve two construction project management problems. These problems are both in discrete domain including two or tree objectives, separately. In this regard, some procedures has been suggested and then applied to adopt both algorithms capable in solving the problems in a discrete domain. Results show the advantages and effectiveness of the used procedures in reporting the optimal Pareto for the optimization problems. Moreover, the NSGA-II is more successful in determining optimal alternatives in both time-cost trade-off (TCTO) and time-cost-quality trade-off (TCQTO) problems than the MOPSO algorithm.  相似文献   

7.
Reliability problems are an important type of optimization problems that are motivated by different needs of real-world applications such as telecommunication systems, transformation systems, and electrical systems, so on. This paper studies a special type of these problems which is called redundancy allocation problem (RAP) and develops a bi-objective RAP (BORAP). The model includes non-repairable series–parallel systems in which the redundancy strategy is considered as a decision variable for individual subsystems. The objective functions of the model are (1) maximizing system reliability and (2) minimizing the system cost. Meanwhile, subject to system-level constraint, the best redundancy strategy among active or cold-standby, component type, and the redundancy level for each subsystem should be determined. To have a more practical model, we have also considered non-constant component hazard functions and imperfect switching of cold-standby redundant component. To solve the model, since RAP belong to the NP-hard class of the optimization problems, two effective multi-objective metaheuristic algorithms named non-dominated sorting genetic algorithms (NSGA-II) and multi-objective particle swarm optimization (MOPSO) are proposed. Finally, the performance of the algorithms is analyzed on a typical case and conclusions are demonstrated.  相似文献   

8.
Cell formation problem is the main issue in designing cellular manufacturing systems. The most important objective in the cell formation problem is to minimize the number of exceptional elements which helps to reduce the number of intercellular movements. Another important but rarely used objective function is to minimize the number of voids inside of the machine cells. This objective function is considered in order to increase the utilization of the machines. We present a bi-objective mathematical model to simultaneously minimize the number of exceptional elements and the number of voids in the part machine incidence matrix. An ε-constraint method is then applied to solve the model and to generate the efficient solutions. Because of the NP-hardness of the model, the optimal algorithms can not be used in large-scale problems and therefore, we have also developed a bi-objective genetic algorithm. Some numerical examples are considered to illustrate the performance of the model and the effectiveness of the solution algorithms. The results demonstrate that in comparison with the ε-constraint method, the proposed genetic algorithm can obtain efficient solution in a reasonable run time.  相似文献   

9.

Parallel machine scheduling is one of the most common studied problems in recent years, however, this classic optimization problem has to achieve two conflicting objectives, i.e. minimizing the total tardiness and minimizing the total wastes, if the scheduling is done in the context of plastic injection industry where jobs are splitting and molds are important constraints. This paper proposes a mathematical model for scheduling parallel machines with splitting jobs and resource constraints. Two minimization objectives - the total tardiness and the number of waste - are considered, simultaneously. The obtained model is a bi-objective integer linear programming model that is shown to be of NP-hard class optimization problems. In this paper, a novel Multi-Objective Volleyball Premier League (MOVPL) algorithm is presented for solving the aforementioned problem. This algorithm uses the crowding distance concept used in NSGA-II as an extension of the Volleyball Premier League (VPL) that we recently introduced. Furthermore, the results are compared with six multi-objective metaheuristic algorithms of MOPSO, NSGA-II, MOGWO, MOALO, MOEA/D, and SPEA2. Using five standard metrics and ten test problems, the performance of the Pareto-based algorithms was investigated. The results demonstrate that in general, the proposed algorithm has supremacy than the other four algorithms.

  相似文献   

10.
This paper presents a bi-objective mathematical programming model for the restricted facility location problem, under a congestion and pricing policy. Motivated by various applications such as locating server on internet mirror sites and communication networks, this research investigates congested systems with immobile servers and stochastic demand as M/M/m/k queues. For this problem, we consider two simultaneous perspectives; (1) customers who desire to limit waiting time for service and (2) service providers who intend to increase profits. We formulate a bi-objective facility location problem with two objective functions: (i) maximizing total profit of the whole system and (ii) minimizing the sum of waiting time in queues; the model type is mixed-integer nonlinear. Then, a multi-objective optimization algorithm based on vibration theory (so-called multi-objective vibration damping optimization (MOVDO)), is developed to solve the model. Moreover, the Taguchi method is also implemented, using a response metric to tune the parameters. The results are analyzed and compared with a non-dominated sorting genetic algorithm (NSGA-II) as a well-developed multi-objective evolutionary optimization algorithm. Computational results demonstrate the efficiency of the proposed MOVDO to solve large-scale problems.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号