首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 32 毫秒
1.
Aspiring to adopt a nonstatistical quantitative approach to safety assessment, this study implements a multiattribute decision-making tool to elicit knowledge from experts and formalize it into a set of weighted safety factors. The environment addressed is the construction site and the specific factors studied are those affecting safety due to the operation of tower cranes. Nineteen senior construction equipment and safety experts were interviewed and led through the analytic hierarchy process (AHP) to provide their assessments on the relative importance of safety factors obtained in an earlier study. The results accentuate the dominance of the crane operator and general superintendent on the site safety scene and play down the contribution of “classic” site hazards such as power lines. Quantitative measuring of safety, such as reflected in the weights obtained in this study, is important in communicating safety requirements and focusing the limited resources available for safety improvements. These factor weights are also deemed to be a vital component in the development of a comprehensive model that will allow the computation of safety indices for individual construction sites employing tower cranes. It is expected that the methodology can then be adopted for addressing other site safety issues as well.  相似文献   

2.
One of the major causes of fatalities during construction is the use of cranes or derricks during lifting operations. Using the Occupational Safety and Health Administration’s (OSHA) case files from fatality investigations during the years 1997–2003, the writers examined the data to determine the proximal causes and contributing physical factors. The research results showed the use of mobile cranes with lattice and telescopic booms, truck or crawler mounted, represented over 84% of the fatalities in the use of cranes/derricks. To reduce the rate of crane fatalities the writers believe that crane operators and riggers should be qualified and requalification should occur every 3?years. Crane safety training must be provided to specialty trade crafts before they are allowed to work around cranes during lifting operations. In addition, a “diligent” competent person [as defined in 29CFR 1926.32(f)] should be in charge of all aspects of lifting operations. Finally, OSHA should improve its system of collecting information during fatality investigations, placing emphasis on intervention strategies to improve usefulness of the investigations to researchers and policymakers inside and outside the Agency.  相似文献   

3.
Tower cranes are the centerpiece of production on today’s typical building construction sites. Tower cranes hoist and transport a variety of loads near and above people, working under crowded conditions, occasionally with overlapping work zones, and often under time, budget, and labor constraints. This work regime further increases the safety risk on sites that are inherently hazardous workplaces. This paper presents the results of a study that identified the major factors affecting safety in tower-crane environments and evaluated the degree to which each factor influences ongoing safety on site. Use of statistical data on accidents was ruled out as a source of information due to the countless number of incidents that go unreported, the common inability of statistics to provide root causes, and the questionability of statistics as a predictor of accidents. The research methodology was therefore based on comprehensive questioning of an expert team that included the safety managers and equipment managers of leading construction companies. With the limited resources available for safety improvement and accident prevention, greater attention must be paid by all parties involved to those factors evaluated as highly affecting site safety due to tower-crane work.  相似文献   

4.
Operators of tower cranes enjoy a bird’s eye view of the site, which undeniably contributes to work safety and efficiency. Yet their work often involves blind lifts, as well as other viewing difficulties, that impede full utilization of the potential inherent in the operator’s location atop the crane. This paper reports on a tower-crane-mounted live video system that offers a solution for such difficulties, and consequently, enhances safety, improves productivity, and brings about direct and indirect cost savings. The development and implementation of the vision system are described as a successful academia–industry research and development joint effort. Work studies of numerous craning cycles resulted in considerable time savings, depending on the nature of the lift, lighting conditions, and viewing obstructions. In addition, a detailed list of benefits drawn on the basis of feedback received from the field is presented. The paper is aimed, first and foremost, at project managers as well as construction equipment and safety practitioners, who daily experience those situations that have prompted the development of the system. Researchers may benefit mainly from the lessons learned with respect to the role of academia–industry cooperation in the introduction of innovative systems in construction.  相似文献   

5.
Identifying spatial-conflict free locations of mobile cranes that could minimize delays associated with crane relocation can result in productivity and safety improvements on construction sites. Existing approaches for identifying possible crane locations are based on two-dimensional (2D) work envelopes created by reasoning about the lift capacities of a crane during operations. Since spatial conflicts related to crane operations typically occur in three dimensions and during any period of operation, representing possible crane locations based on such 2D work envelopes can result in identifying some locations as good when in fact they might result in conflicts and missing possible locations that might be feasible. This paper presents an approach that determines possible locations of mobile cranes based on discrete-event simulation of crane operations incorporating dynamic behaviors of cranes. This approach starts with identifying a search space for possible crane locations by reasoning about a reachability radius of a crane determined by crane characteristics and the weight of the load to be carried. Later, it reduces the search space through boom-line intersection tests. For the remaining locations, it checks for potential spatial conflicts between building components and cranes moving in three dimensions and across time. Validation studies show that the developed approach can accurately identify possible locations for mobile cranes that minimize the relocation of mobile cranes and avoid potential spatial conflicts.  相似文献   

6.
The incremental coordination method a computational method for preplanning and coordinating the use of multiple tower cranes in relatively narrow construction sites is presented. The incremental coordination method considers the kinematics and the geometrical constraints of cranes to plan the motion of two or more cranes, which are being operated in collaboration. By following such planned motions, erection tasks are completed safely, even when the cranes are operated in close proximity of each other. This method allows the use of computers to plan and coordinate the crane activities from start to end of an erection process. This paper also explains the computational methods required by the incremental coordinate method including path-finding and collision detecting methods. An example case shows two construction cranes, each of three degrees-of-freedom, operating together on a building project where the working areas of the cranes intersect, hence possibility colliding with each other. A numerical test was conducted to verify the efficiency and effectiveness of applying the incremental coordination method in planning and synchronizing all motions of the two cranes to avoid any collision between the cranes themselves and collision with obstacles on the construction site.  相似文献   

7.
Safety climate can benefit contractors, specialty contractors, and owners of industries by providing them with the knowledge of attitudes and perceptions that can help to consistently achieve better safety performance. The objective of this research was to determine safety climate that would enhance safety culture and positively impact perceived safety performance on construction projects. A safety climate questionnaire survey was conducted on the construction sites of a leading construction company and its subcontractors in Hong Kong. Approximately, 1,500 hard copy questionnaires were distributed and the response rate was excellent, resulting in 1,120 valid questionnaires being collected from 22 construction projects. By means of factor analysis, two underlying safety climate factors were extracted, accounting for 43.9% of the total variance. Multiple regression analysis confirmed that these climate factors, “management commitment and employee involvement” and “inappropriate safety procedure and work practices” were significant predictors of workers’ perceptions of safety performance. The findings indicated that the relationship between perceived safety performance and “inappropriate safety procedure and work practices” was inversely correlated. The results suggest that safety climate can be used as an effective measure of assessing and improving site safety for projects under construction. The findings of this study and the methodology might be useful for research at other construction sites in other regions and countries. This work provides useful information for project managers and safety practitioners who desire to improve safety climate and safety performance on construction sites.  相似文献   

8.
A computerized model to optimize location of a group of tower cranes is presented. Location criteria are balanced workload, minimum likelihood of conflicts with each other, and high efficiency of operations. Three submodels are also presented. First, the initial location model classifies tasks into groups and identifies feasible location for each crane according to geometric “closeness.” Second, the former task groups are adjusted to yield smooth workloads and minimal conflicts. Finally, a single-tower-crane optimization model is applied crane by crane to search for optimal location in terms of minimal hook transportation time. Experimental results and the steps necessary for implementation of the model are discussed.  相似文献   

9.
This paper presents the concept used to construct a complex residential tilt-up-panel structure utilizing three-dimensional (3D) modeling and animations. The residence comprises of 108 precast concrete panels of varying rectangular shapes with “dog legs” and window and door “cutouts” that look like an assembled jigsaw puzzle. The erection and installation procedure called for a maximum panel-to-panel joint tolerance of 1.27?cm (0.5?in.), often in 90° joints between panels. 3D animations were used to experiment with the construction process on the computer screen prior to construction in order to avoid potential costly on-site errors. In addition, the 3D animations were also used as a training tool for the contractors. This paper focuses on describing the methodology used to integrate a crane selection algorithm and optimization model with 3D modeling and animation for the selection, utilization, and location of cranes on construction sites. Analytical optimization processes were used to decrease the traveling time and distance of the selected crane, to improve the crane lifting sequence and to minimize the use of panel casting slabs.  相似文献   

10.
Cranes have come to symbolize building construction itself. They perform indispensable services in moving materials and components vertically and horizontally. Used since antiquity, their history is interrelated with the development of new power sources that replaced man and mule, first steam and later internal combustion, diesel, and electric engines. Mobile cranes can be rapidly deployed to lift heavy loads. New models with telescoping booms and all-terrain travel capability, compact urban machines, and even hybrids with tower cranes are beginning to replace the familiar lattice boom truck cranes. Mobile cranes have dominated the North American market, but a cultural change appears to be taking place toward tower cranes for building projects. Tower cranes, common in Europe for decades, are globally gaining in popularity with surging real estate developments. Ideal for dense urban environments and coming with a small footprint, they are available in a growing diversity of sizes and configurations. Sophisticated electronic controls and operator assistance devices are enhancing their safe and productive operation. While cranes occupy a central role on midrise and high-rise building projects, they operate in conjunction with other types of supporting equipment that are an essential part of the overall equipment array on today’s industrialized construction sites.  相似文献   

11.
The conception, development, implementation, and commercialization of a crane-mounted vision system through close academia-industry cooperation illustrate how such joint efforts can yield research and development success. The vision system was devised to help solve the problem of blind lifts and other viewing concerns related to the operation of tower cranes on construction sites, thereby enhancing safety and productivity and saving money. In addition to other expected difficulties, the project faced the traditional skepticism of a conservative industry reluctant to adopt changes. The paper relays the chronology of the project and analyzes, stage by stage, the steps taken by the university-based developers to work in harmony with construction companies in particular, and with the industry at large, to ensure success. Lessons drawn from this experience are offered to future academician developers in the field of construction technology.  相似文献   

12.
Managing heavy-pressure vessel lifts on construction sites requires planning, arranging adequate crane support, and preparing collision-free rotation (from a horizontal position to a vertical position) of the vessel. Generally, selecting mobile cranes and developing engineered lift studies for vessels are done using two cranes and analyzing the lift for each crane individually on the basis of the selected cranes’ lift-capacity specifications provided by crane manufactures. This practice is relatively costly and time-consuming. Optimizing the mobile cranes’ use and location is also difficult. To assist in the field operation of mobile cranes and to provide engineers with a planning tool, this paper presents a methodology to carry out such a lift utilizing only one crane. Using the developed methodology and mechanism, heavy vessels can be rotated off the ground (in the air) with one crane. The proposed mechanism is supported with a mathematical model that has been developed into a computer system and has been integrated with a previously developed crane selection and ground pressure calculation system and crane database. The developed system provides users with a lift study analysis for a given configuration as well as simulation results with interactive graphics to assist in the selection of an optimum configuration. This research is important as projects involving heavy lifts need to reduce the cost and time associated with construction operations.  相似文献   

13.
Safety is a major concern in the construction industry because fatalities and injuries from construction work bring great losses to individuals, organizations, and societies as a whole. This paper aims to understand how construction personnel perceive safety risks in China as compared with those in Australia. Postal questionnaire surveys were used to collect data on safety risk perceptions from the two nations. The safety risk factors were assessed using a risk significance index based on the likelihood of occurrences and the impacts on safety performance. The survey results revealed that in China the main perception of safety risks came from human-and/or procedure-related issues, with “low/no safety education” paramount, followed by “inadequate fire prevention and electrical prevention procedures,” etc. In contrast, the major safety risks perceived in Australia were related to the environment and physical site conditions with “contamination of land, water and air” ranked first, followed by “unforeseen excavation of soil,” etc. To minimize construction safety risks in China, this paper suggests that the government should develop collective legislation and safety protection procedures, and enforce safety education and training to all site participants. Risks related to environmental and site conditions were generally realized by the Australia construction industry, which were not highly acknowledged in China. This may also bring imminent attention in this regard to the Chinese government.  相似文献   

14.
Tower cranes are widely used in the construction of high-rise buildings and the analysis of their dynamic behaviors is of both theoretical and practical significance. A parameterized super element formulation for modeling the multiple-pulley cables in a crane system is proposed based on the friction-free assumption between the cable and pulleys. The cable passages over intermediate pulleys are considered as new degrees-of-freedom in the proposed element model and equal tensions at different segments of a continuous cable are exactly achieved. Numerical results show that these cable passages have significant effect on both static tensions and dynamic properties of tower cranes and the proposed super element model provides more accurate and realistic results in dynamic analyses of the crane system. It is found that some modes are insensitive to the change of jib angle or bracings at crane mast, while others change drastically depending on the mode shapes. Picking up the payload from ground or payload accelerating/decelerating during lift operation will induce finite impulsive excitations and, therefore causes noticeable dynamic responses of the crane system.  相似文献   

15.
Lifting capacity charts are tabulated and provided to operators and practitioners by mobile crane manufacturers. These charts are structured based on predetermined crane configurations, which consist of boom/jib length, lifting radius, main boom angle to ground, and jib angle to ground or its offset to its main boom centerline. It is a tedious job that lifting planners select cranes for construction projects based on a large number of lifting capacity charts. This paper presents a newly developed algorithm for selecting mobile cranes on construction sites, which takes into account the lifting capacity, the geometrical characteristics of the crane, the dimensions of equipments and riggings, and the ground bearing pressure. The algorithm is incorporated into a three-dimensional (3D) computer-aided system that integrates crane selection module, crane modeling module, 3D-simulation module, 3D computer-aided design modeling module, rigging calculation module, and data management module. At last, a case is represented in order to demonstrate the use of the developed algorithm and to illustrate its essential features.  相似文献   

16.
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project’s life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman’s rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.  相似文献   

17.
Due to the central role of cranes in construction operations, specialists in the construction industries have cooperated in the development of structured methods and software for crane selection. Most of these software tools are for crane model selection, and integrated systems that handle both crane type and model selection are not readily available. This paper presents the crane type selection features of IntelliCranes, a prototype integrated crane selection tool that assists in both crane type and crane model selection based on a set of inputs describing the construction operation under consideration. By using historical data and advanced artificial intelligence computing tools such as artificial neural networks, IntelliCranes automates crane type selection. Crane type and crane model selection are seamlessly integrated in a comprehensive crane selection tool, and consistency in the selection of cranes for similar situations is increased.  相似文献   

18.
Mobile crane manufacturers provide operators and practitioners with tabulated lift-capacity charts. These charts are structured based on predetermined crane configurations, which consist of boom/jib length, lifting radius, lifting height, main boom angles to ground, and jib angle to ground or its offset to its main boom centerline. Practitioners, however, are often required to lift on a partially extended hydraulic section and/or lifting radius other than those listed in the manufacturers’ lift-capacity charts. This paper presents a newly developed optimization algorithm (referred to in this paper as Algorithm-2) for selecting and locating mobile cranes on construction sites based on their minimum boom length and/or minimum radius, accordingly higher lifting capacities. Algorithm-2 includes an optimization procedure that avoids lifting capacity violations. In addition to the practical use of Algorithm 2, the mathematical representations of the crane’s geometry are also useful for research in the automation and robotic field of operations involving cranes. The algorithm is incorporated into a computer system that integrates a selection module and a database. Data pertinent to crane lift configurations are retrieved from the database and are then processed to determine the optimum, geometrical selection of the crane configuration. A case example is described in order to demonstrate the use of the developed algorithm and to illustrate its essential features.  相似文献   

19.
The high expectation of esthetic and functional quality in modern civil infrastructure has resulted in the increased demand for long span bridges. In advanced or developing countries, long span bridges such as cable-stayed and suspension bridges are considered even as landmarks that symbolize the prosperity or culture of the region. These long span bridges require higher level of design and construction technologies than other types of bridges. In particular, the construction of cable-stayed bridges involves precise and sophisticated operation of construction equipment such as derrick cranes. However, it is not easy to plan the operations of a derrick crane before the actual construction process takes place. Unexpected spatial constraints in the construction site may hinder the smooth operation of a derrick crane, which leads to lower than expected productivity and safety. This study applies interactive three-dimensional (3D) computer aided design (CAD) to the derrick crane operation for the purpose of identifying potential problems. Construction managers can have the two way process with the 3D CAD system to interactively test their construction plans and scenarios. The case study shows that the interactive 3D CAD system significantly improves the constructability of the cable-stayed bridge construction.  相似文献   

20.
This study focuses on the phenomenon of ground instability causing mobile cranes to overturn. Four outriggers usually support a mobile crane in order to restrict pitching during hoisting operations. Nevertheless, the crane may become quite unstable if the outriggers should happen to sink into the bearing ground. In this paper, various types of analysis, including experiments, were performed in order to investigate the influence of ground penetration by outriggers on the stability of mobile cranes. Through study of the results of experimentation and simulation, it has been clarified that mobile cranes become highly unstable as a result of rapid penetration. It was found that an index of relative instability had a linear relationship to the common logarithm of an index for brittle failure as derived from the load–settlement curve for ground penetration. Finally, a method of evaluating the risk of mobile-crane overturning is proposed by using the maximum value of both the supporting surface’s failure risk and the kinetic risk due to ground penetration.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号