首页 | 官方网站   微博 | 高级检索  
     

基于SEM的装配式建筑设计阶段风险研究
引用本文:刘喆,刘娜,周瑞,董坤.基于SEM的装配式建筑设计阶段风险研究[J].工程管理学报,2019,0(5):40-044.
作者姓名:刘喆  刘娜  周瑞  董坤
作者单位:吉林建筑大学 经济与管理学院,吉林 长春,130118;山东建筑大学 管理工程学院,山东 济南,250101
摘    要:装配式建筑设计阶段的成果直接影响后续构件的生产和施工质量,为有效解决设计阶段风险所造成的项目进度、成本、质量问题,从装配式建筑设计—生产—施工全过程角度出发,对装配式建筑设计阶段风险进行定量分析与定性评价,通过文献整理方法识别出该阶段主要风险并发放调查问卷,利用所获取的有效数据构建结构方程模型(SEM)进行分析评价。研究结果表明,装配式建筑成本受设计阶段风险影响较为显著,且主要来自于技术风险,设计—生产—安装各环节间缺少协同管理平台、构件划分不合理等是设计阶段率先考虑的风险因素。并提出该阶段发展建议,为装配式建筑可持续发展提供参考。

关 键 词:装配式建筑  设计阶段  结构方程模型  风险评价

SEM-based Research on the Risks of PrefabricatedBuildings at the Design Stage
LIU Zhe,LIU Na,ZHOU Rui,DONG Kun.SEM-based Research on the Risks of PrefabricatedBuildings at the Design Stage[J].Journal of Engineering Management,2019,0(5):40-044.
Authors:LIU Zhe  LIU Na  ZHOU Rui  DONG Kun
Affiliation:1,2,3. School of Economics and Management,Jilin Architecture And Civil Engineering Institute;4. School of Management Engineering,Shandong Jianzhu University
Abstract:The performance of prefabricated buildings at design stage directly affects the quality of onsite construction. Toeffectively solve the problems regarding project schedule,cost and quality that are caused by the risks at the design stage ,this studyconducts both quantitative and qualitative evaluation of the risk of prefabricated buildings from the perspective of thedesign-production-construction process of prefabricated buildings. The main risks at this stage are identified through a literaturereview and questionnaire survey. The structural equation modeling (SEM)method is used for data analysis and risk evaluation. Theresults show that the cost of prefabricated buildings is affected by the risks at the design stage,and it mainly stems from technicalrisks. The lack of collaborative management platform between design and production-installation and the unreasonable division ofcomponents are the primary risk factors considered at the design stage. Finally,based on the analysis results,the developmentrecommendations are proposed to provide reference for the sustainable development of prefabricated buildings.
Keywords:prefabricated building  design stage  structural equation model  risk assessment
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号